Steam turbines are not just restricted to conventional or nuclear power plants, they are widely used in combined cycle power plants, concentrated solar thermal plants and also geothermal power plants. The operational requirements of a steam turbine in the combined cycle and CSP’s means that they operate under transient conditions. Even in conventional steam turbines, the market requirements are changing with requirements for faster and more frequent start-up which can result into faster deterioration of the equipment and reduced lifespan. During the startup phase, significant heat exchange takes place between the steam and the structural components that include the valves, rotor and casing. The accuracy of the life prediction is strongly affected and dependent on the accuracy of the transient thermal state prediction [1].
Though the expansion of steam takes place in the nozzles and blades, the influence of the leakage steam during the startup phase is significant with steam expanding through the labyrinths resulting in expansions, condensation, and increased velocities which may even reach supersonic levels. During cold start, the flow is minimal, the temperature of the metal is at room temperature and heat exchange happens between the steam and metal parts resulting in thermal stress.